QDR – the Quantec direct marketing controller

The QDR is designed for power generation plants of all sizes and obtains the actual values of the feed-in power from the meter connection.

Provided that a few conditions are met - such as a functioning load management system - the classic QDR already enables the required remote control. Parking configuration and existing communication possibilities only play a minor role. The powerful system is up to any requirement and Quantec Systems supplies it individually adapted to the respective structure of the energy systems.

QDR-klassisch-en.jpg

The QDR is configured to provide all the relevant information and functions required by law in connection with remote control.* It is also open for the connection of claVis, the multi-compatible interface for access to real-time monitoring of the operating states of energy systems. This means that the actual feed-in data can be made available even without a meter connection.

The interface flexibility of the system makes it possible to integrate the „QDR“ into any configuration of energy systems.

Optional performance features:

The „QDR classic“ is open for more, for example for ...
... the forwarding of the actual feed-in power and the control signals of the transmission system operators and direct marketers to the management
... the acquisition of load profiles of existing meters
... the recording of the power quality and other parameters
... the analog transmission of digital control signals from the transmission system operators: this option allows infinitely variable control of the feed-in power if the infrastructure is suitable.

Behind this is custom work, as individual as the profiles of your wind farms - and just as individual is the way we develop your offer. Click here for your QDR online request.

* Regulation in Germany: According to the EEG amendment 2014, remote control is mandatory for new installations in Germany. This applies to power generation plants that were put into operation on or after January 1, 2012. The Management Premium Ordinance (MaPrV) was repealed as of July 31, 2014. In accordance with the EEG, the management bonus is integrated into the market bonus. Since April 1, 2015, the state has only subsidized remotely controllable plants with the market bonus. This also applies to old plants.

Load Management 2.0, the integrated solution from Quantec Systems - and what‘s in it for you

Pure software solutions are increasingly establishing themselves as an alternative and parallel to dedicated hardware/software complexes. The latter show their advantages in comparable tasks mainly by the reduction of error influencing factors and significantly lower installation costs. In this respect, the concentration on software also offers enormous potential for efficiency, flexibility and convenience - not least during commissioning, updates or upgrades.

The integrative load management 2.0:

Against this background, Quantec Systems has developed Load Management 2.0. The striking differences compared to „conventional“ load management are the concentration on a pure software solution and „direct ways“ of integration into the IT landscape of wind farms - regardless of the configuration.

The ideal, but not exclusive prerequisite for the operation of Load Management 2.0 is the use of a suitable park PC from Quantec Systems. This robust computer has been specially designed for heavy-duty environments and is therefore installed in numerous German and international wind farms.

The structure:

Lastmanagement2.jpg

The main advantages of the IT solution compared to the conventional hardware-bound structure:

  • uncomplicated from installation to operation
  • Simplified process by avoiding detours and therefore less „friction losses
  • Reduction of error influencing factors
  • Shorter response times
  • Technically robust structure
  • Flexibility of use through park individual configuration
  • Interface flexibility - thus among other things free choice of communication channels
  • The integration into the wind farms is independent of their IT structure and operated turbine types

Availability:

  • Remote installation is possible if a suitable park PC from Quantec Systems is available in the wind park.
  • Minimal time required to switch to the new load management solution